The record
Everything the slot carries, as measured. Series arrays are drawn above and listed here in full.
| Event typeevent_type | Debris Flow |
|---|---|
| NOAA NCEI event IDncei_event_id | 693,125 |
| Episode IDepisode_id | 114,928 |
| Begin UTCbegin_utc | 2017-01-09T02:00:00+00:00 |
| End UTCend_utc | 2017-01-09T02:00:00+00:00 |
| Statestate | CALIFORNIA |
| County/zone typecz_type | C |
| County/zone namecz_name | NEVADA |
| Latitudelat | 39.333 |
| Longitudelon | -120.282 |
| End latitudeend_lat | 39.333 |
| End longitudeend_lon | -120.287 |
| Flood causeflood_cause | Heavy Rain / Snow Melt |
| Deaths directdeaths_direct | 0 |
| Deaths indirectdeaths_indirect | 0 |
| Injuries directinjuries_direct | 0 |
| Injuries indirectinjuries_indirect | 0 |
| Damage propertydamage_property | 480.00K |
| Damage cropsdamage_crops | 0.00K |
| Weather forecast office sourcewfo_source | Department of Highways |
| Episode narrativeepisode_narrative | A strong atmospheric river brought heavy rain with widespread flooding on the 8th and 9th. Before warmer air moved into the region, there was a period of snow on the 7th as well as freezing rain in some lower valleys lasting into the morning of the 8th. Widespread rainfall totals of 3 to 7 inches fell in and near the Sierra, with heavier amounts between 8 and 12 inches near the Sierra crest. |
| Event narrativeevent_narrative | A large mudslide near the Donner Lake Interchange on Interstate 80 caused the closure of the freeway. The westbound lanes closed at 1802PST, followed by the eastbound lanes (downed power lines) at 1918PST. The road was completely closed between Kingvale and Truckee until 0520PST on the 9th when it was opened for local traffic and law enforcement. The freeway was fully opened at 1040PST on the 9th. The damage estimate was obtained from a preliminary damage assessment from CALTRANS. |
| Yearyear | 2,017 |
Provenance
This slot's source list is not carried on the manifest row; open the dossier below.
Storage: spine